Embedded Traceability
This local traceability register connects the Embedded intended-behavior pages to the requirements baseline. Entries are deliberately medium-granularity so that each behavior can be reviewed against firmware later without treating implementation as the source of truth.
E1000001
Controller coordination claim in the table below.
E1000002
Detector timing claim in the table below.
E1000003
Effective-pixel acquisition claim in the table below.
E1000004
USB frame-completeness claim in the table below.
E1000005
Driver-board interface claim in the table below.
E1000006
Calibration and evidence claim in the table below.
ID |
Behavior claim |
Defining pages |
Alignment state |
Future evidence location |
Requirements evidence |
|---|---|---|---|---|---|
|
The STM32F411CEU6 coordinates detector timing, acquisition, frame ownership, and USB handoff. |
|
Not Started |
Firmware review and controller verification |
Requirements And Metrics; Design Document functional and resource requirements |
|
The controller generates fM near 2 MHz, ICG with an 8 ms period and 7.388 ms pulse target, and SH with a 10 microsecond pulse target. |
|
Not Started |
Timing-reference captures |
Requirements And Metrics; Design Document CCD timing requirements |
|
Acquisition preserves all 3648 effective detector pixels in order. |
|
Not Started |
ADC/DMA capture evidence and frame-geometry check |
Requirements And Metrics detector geometry |
|
A transferred frame is complete and carries frame identity and status information. |
|
Not Started |
Integration contract and USB stream verification |
Requirements And Metrics USB transfer |
|
The driver-board interface routes timing and analog signals while supporting power integrity and pre-power continuity checks. |
|
Not Started |
Board inspection and interface verification |
Design Document embedded and EMC design requirements |
|
Timing-reference and frame-geometry checks produce linked evidence and an explicit unresolved disposition when requirements are missing. |
|
Not Started |
Test and Verification evidence register |
Requirements And Metrics; calibration and characterization guidance |
Open contract items include total transported sample geometry, packet encoding,
integration-time semantics, ADC trigger details, exact signal ownership,
hardware electrical limits, and evidence retention rules. These remain
Not In Docs until the responsible section defines them.